ZBW box type transformer substation

Update: 2016/9/6      View:
  • Brand:    
  • Type:    
  • Order Online
Introduction

Zbw box type substation system superior voltage of 40.5kV lower voltage 12kV (7.2) three-phase AC 50Hz outdoor equipment is widely used in the city and township, plant, oil field and other places. It can also be used in a number of large construction sites, as acceptance, transformation and distribution of electricity to use. With complete and strong, covers an area of small, convenient installation and use, low cost, comprehensive high degree of automation, safe and reliable operation and so on characteristics.

1 models and their implications

2 main technical parameters

3 installation

1 basis

This type of prefabricated substation is needed to be poured on the ground floor of the steel plate concrete foundation.

2 transformer, 40.5kV switch room, 12kV switch room for separate transport units, assembled in the field.

3 power supply and lead to the introduction of the two forms of overhead and cable, the user can choose according to the need, please specify when ordering.

4 put into operation before the inspection, adjustment and test

Complete installation of prefabricated substation after operation should be carried out before the inspection, adjustment and test, test must be before the introduction of lead wire disconnection.

1 adjustment

Pre installed substation factory has been adjusted well, under normal circumstances users do not have to re adjust. If the inspection found that the changes in the parameters or do not meet the relevant requirements, should be promptly adjusted.

2 test

2.1 operation test

The main switch points, closing test, should be able to smooth points.

2.2 power frequency withstand voltage test

40.5kV complete sets of equipment main circuit 1min 76kV

Auxiliary circuit 1min 2kV

12kV complete sets of equipment main circuit 1min 34kV

Auxiliary circuit 1min 2kV

6kV complete sets of equipment main circuit 1min 28kV

Auxiliary circuit 1min 2kV

2.3 other tests

For other electrical components and auxiliary circuit, bus, grounding and relay protection, the test is carried out according to the relevant standards and regulations.

3 run pre inspection: check items and requirements see table below

5 maintenance, inspection and precautions

1 maintenance

1.1 regular checks:

A) check the relay action is normal B) check the signal and indicating whether normal; c) check points, closing and storage can supply is normal.

1.2 annual inspection and maintenance items:

A) check one, the two circuit connection point is loose, overload; b) with the European table test interphase, on the ground of the insulation, observe whether there is damage, aging;

C) to eliminate dust, foreign matter; d) to do a good job of the inspection records.

1.3 after each move is re installed, should be fully checked and tested.

2 maintenance and matters needing attention

When the abnormal phenomenon or a part is not normal, it is necessary to outage overhaul or replacement, maintenance must be disconnected on the first level of isolation switch, and linked to a reliable grounding wire, to confirm the power, can enter the overhaul.

6 transportation and storage

The factory prefabricated substation migration, be divided into several transport units for transport, if installed SF6 circuit breaker, it should be deflated to zero gauge pressure.

This product should be stored in ventilated, dry, non corrosive gas sites.

7 ordering instructions

User order should be explained:

1 pre installed substation type, quantity;

2 transformer type and capacity;

3 to provide an electrical system diagram and the two schematic.