此页面上的内容需要较新版本的 Adobe Flash Player。

获取 Adobe Flash Player

YBW box type transformer substation

Update: 2016/9/6      View:
  • Brand:    
  • Type:    
  • Order Online
Introduction

1 functions and features

1 high voltage switchgear, transformer, low voltage switchgear, complete set;

2 high, low voltage protection, safe and reliable operation, easy maintenance;

3 less land, investment, production cycle is short, easy to move;

4 wiring scheme flexible and diverse;

5 unique structure: unique cellular structure of the double layer (composite plate) shell solid, heat insulation and ventilation, easy to operate, beautiful, high protection, the shell material has stainless steel titanium alloy, aluminum alloy, cold rolled plate, color steel plate;

6 types of diversity: general type, villa type, compact and other styles;

7 high pressure ring network cabinet assembly network automation terminal (FTU) to achieve a short circuit and single phase grounding fault reliable detection with "four remote" function, easy to upgrade the distribution network automation

2 use

Widely used in urban power grid transformation, residential areas, high-rise buildings, industrial and mining, hotels, shopping malls, airports, railways, oil fields, docks, highways and temporary electricity facilities, such as home and outside.

3 high pressure side

High pressure side

Prefabricated substation high-voltage load switch fuse combined electrical protection generally use, fuse phase after fusing, three-phase linkage tripping, load switch have gas, compressed air, vacuum, hexafluoride sulfur type optional, with electric operating mechanism, realize the upgrading of automation; fuse for high voltage limit current fuse, with impactor, reliable action, breaking capacity, main technical parameters are shown in the following table. For the more than 800 kV transformer, use ZN12, ZN28, VS1 vacuum circuit breaker protection.

Low pressure side

Low voltage side of the main switch by universal or intelligent type circuit breaker, selective protection; outlet switch selects new molded case switch has the advantages of small volume, short flashover, up to 30 back; intelligent automatic tracking reactive compensation device, contactor and contact two switching methods for users to choose.

Transformer

Prefabricated substation selection of low loss, oil immersed, fully sealed S9, S10, S11 series transformer can also be use resin insulation or Nomex insulate environment-friendly dry type transformer and bottom are equipped with car, the transformer can be conveniently access.

4 implementation standards

This product complies with the following standards:

GB/T17467-1998< high voltage / low voltage prefabricated substation

DL/T537-93<6-35kV box type substation order technical conditions >

5 high voltage fuse technology parameters

6 outline and installation dimensions

7FN12-12D/630-20 indoor high voltage load switch compressor

8 mechanical characteristic parameters

9 shape and size

10 outline and installation dimensions

11 a plan diagram

One time plan

A high voltage side of the transformer substation scheme see attached 1, a low voltage side of the program, see attached 2

Example diagram of a typical program

Example diagram of a typical program see attached 3

Plan layout

Substation layout see attached 4, the user can choose according to need.

Basic graph

The basic drawing of substation is attached to 5

12 installation, use and maintenance

Pre installed substation in the installation, acceptance, transfer test, test, operation and maintenance and other aspects of the power sector in addition to the requirements of the implementation of the provisions, but also pay attention to the following matters:

A, the user should be carefully checked by the relevant provisions of the product, the product is not immediately installed, should be in accordance with the normal use of conditions, stored in the appropriate places.

B, the product should be used at the bottom of the hoist lift, as shown in Figure 3

C, level of the products placed in well in advance of the foundation, and the gap between the pedestal and base of product cement mortar used to wipe seal, in order to avoid the rain water from entering cable chamber, through the high and low pressure chamber of the bottom seal board access high, low voltage cable.

D, product installation should be well grounded and reliable; power socket, negative to steel on the two main terminals, transformer neutral point and the shell, lightning arrester pile first shall be respectively by the installation department ground. All grounding should share a assembling device, and connected with the resistance to socialize less than 4 ohm, from grounding lead to products connected leads should be not less than two.

E products in the installation or maintenance, inspection and test for the following items should be put into operation before:

(1) whether it is clean in the transformer substation;

(2) whether the operating mechanism is flexible;

(3) whether the main electrical appliances are flexible and reliable;

(4) whether the electrical auxiliary contact is reliable and accurate;

(5) the accuracy of the meter and relay operation;

(6) ratio and connection of instrument and transformer polarity is correct;

(7) all the electric appliance mounting nut is tightened, whether the installation is firm and reliable;

(8) whether the bus connection is good, its support insulator, clip pieces are installed reliably;

(9) whether the setting value of the electric appliance meets the requirements, whether the fuse core specification is correct or not;

(10) whether the contact of the main circuit and the auxiliary circuit is in accordance with the requirements of the electrical schematic diagram.

F, maintenance

(1) all components of the product are maintained according to their respective technical requirements;

(2) if the selection of the transformer oil immersed, every year should be required to make at least one oil sample analysis examination;

(3) in the operation of the high side switch equipment, after 20 times with load or 2000 times without load switching operations should be check contact and destroy arc device loss degree and found abnormal shall promptly repair or replacement;

(4) automatic tripping of low-voltage switchgear, check analysis tripping, stay after troubleshooting, in order to re operation;

(5) a preventive test should be carried out every year before the arrival of the thunderstorm season;

Products with the packing list, certificate, installation manual, electric wiring diagram and the products used in the main components of the equipment specifications, key operated tools and according to the agreement to provide spare parts.

13 high pressure typical program

14 low voltage typical program

15 terminal type scheme

]


18 substation layout plan